4 Patents
- US121634292024Method of Buffer Layer with Critical Deformation of Tunnel Initial Support as Control Target
THE 5TH ENGINEERING CO., Ltd OF CHINA RAILWAY 11TH BUREAU GROUP
0 cites - US121352572024Perception Evaluation Method for Service Performance of Highway Tunnel Lining Structure
Research Institute Of Highway Ministry Of Transport
0 cites - US117460632023Sulfate Corrosion-resistant Concrete and Method Thereof for Optimizing Proportion and Application
RESEARCH INSTITUTE OF HIGHWAY MINISTRY OF TRANSPORT
0 cites - US115498352023Method for Analyzing the Expansive Stress and Expansive Strain of Tunnel Surrounding Rock
RESEARCH INSTITUTE OF HIGHWAY MINISTRY OF TRANSPORT
0 cites